(click image to enlarge)

Project:

405 Business Park

Description:

Repair building exterior due to vehicle damage

PDF:

405 Business Park0-pdf

Schafer Construction instructions were to “Please make it look like it never happened‚”.


DEMOLITION: Remove stucco and OSB board to expose damage to covered framing on 2 sides. During demolition we discovered some water intrusion problems that Schafer Construction immediately notified the property management. The management wanted Schafer Construction to repair water damaged OSB plywood on the entire panel which we did.


REPAIR AND REPLACE: Repair damaged “2×4‚” lumber on the adjoining corner to 2 sides, reface with OSB board, vapor barrier and re-install stucco exterior. Finish coat and texture was color matched to existing building finish.


CLEAN-UP: All demolition and excess material were hauled offsite and disposed of appropriately. Site was broom swept after work had been completed.