(click image to enlarge)

Project:

Airefco/Hadco Supply

Description:

25, 128 SF of Office / Warehouse

PDF:

Airefco/Hadco Supply0-pdf

Office: Complete office tear down and rebuild (floor to ceiling). Project included creating two bathrooms, training room, conference room, trade store with new additional storefront entrance, kitchen, sales offices, server room and installing a complete new HVAC system with 2 new HVAC rooftop units. New fire alarm system. The office/warehouse demising wall had to be moved out to accommodate the new trade space. All interior doors are new solid core oak doors with timely frames and Yale dark bronze locksets and hinges. Recessed parabolic fluorescent light fixtures throughout with fluorescent can fixtures in the training room. VCT tile flooring in kitchen and trade space where retail racking and slot wall was installed for hanging products. Sheet vinyl and wainscot in bathrooms with granite counter tops, new bathroom fixtures, accessories and partitions. Complete new HVAC system with electronic filters and 2 rooftop HVAC units were also installed. High quality finishes for a warehouse office.


Warehouse: Re-lamp of the entire warehouse and updated fluorescent lighting ballasts where needed. Updated fire alarm system in warehouse. Main electrical panels were updated and traced to get accurate breaker descriptions. Installed two hanging infrared heaters above a shipping station on the far wall of the warehouse for worker comfort in colder months. Warehouse floor was also scrubbed and sealed.


Building Modifications: Created two new dock high doors from two existing grade level doors. Both have mechanical dock levelers and weather protecting dock shelters. Excavation of the new dock high truck doors involved extend one of the building’s spread footings down and out about 7′. New drainage plan with upgraded catch basin servicing a second building. New dock walls also installed and asphalt.


Comments are closed.